AVR - Civil infrastructure and utilities
EN FR
All projects

Refurbishment · Saint-Denis (93)

Refurbishment of the Wilson Building in Saint-Denis (93)

Scope of services: French project phase codes
  • APS: Outline design
  • AVP: Preliminary design
  • PRO/DCE: Detailed design and tender documentation
  • VISA: Review of contractors’ execution drawings for conformity with the design
  • DET: Supervision and administration of construction contracts
  • AOR: Assistance with acceptance, handover and defects close-out
Client
MCF 132 WILSON, 18 rue Jean Giraudoux 75116 PARIS
Design team
M Vilo Bach Architecture + 7 CONCEPT + BETEC SA + ASSEMBLAGE ING + Atelier Tissot + AVR
Area
External areas: 1,300 m²
Construction completion
2024; design started in 2022
Construction cost
Civil infrastructure and utilities: €215,000
Scope of services
APS, AVP, PRO/DCE, VISA, DET, AOR.

Key project features

  • Utility enquiries (DT) and updates to existing utility records.
  • Surface water drainage plans with a stormwater attenuation basin and hydraulic calculations; the site stormwater management report is developed jointly with the landscape architect and Plaine Commune.
  • Coordinated utility plans.
Wilson Building - architectural view of external works
Wilson Building - view 2
Wilson Building - view 3

Open original-size image