Industrial facility · Roissy (95)
Construction of an aerostructures facility in Roissy (95)
Scope of services: French project phase codes
- APS: Outline design
- AVP: Preliminary design
- PRO/DCE: Detailed design and tender documentation
- ACT: Assistance with tendering and contract award
- VISA: Review of contractors’ execution drawings for conformity with the design
- Client
- Air France
- Design team
- Sandrolini architectes, TPS groupe WSP, ADI, SCO, AVR
- Area
- 16,000 m²
- Project dates
- Completed in 2016
- Construction cost
- €12.5 million
- Scope of services
- APS, AVP, PRO/DCE, ACT, VISA.
Key project features
- Industrial facility for the maintenance of aircraft including Boeing 787 and Airbus A350.
- Earthworks, on-site soil treatment and reuse; heavy-duty and light-duty roads and a 640-space car park.
- Road drainage, a 1,440 m³ stormwater storage basin and a 1,650 m³ firefighting water storage basin.
- Hydrocarbon retention and treatment in stormwater.
- Utility coordination, grading and surfacing plans.