PROJECT IN PROGRESS · Cotonou, Benin
Commercial court and court of appeal complex in Cotonou (Benin)
Scope of services: French project phase codes
- APS: Outline design
- AVP: Preliminary design
- PRO/DCE: Detailed design and tender documentation
- ACT: Assistance with tendering and contract award
- Client
- Ministère du Cadre de vie et du Développement durable, Benin
- Design team
- Arte Charpentier (architect), Sara Consult (local architect), Terrell (structural and building services engineering), AVR (civil infrastructure and utilities)
- Civil infrastructure and utilities area
- 6,500 m²
- Construction completion
- 2028; design started in 2024
- Construction cost
- Civil infrastructure and utilities: €364,000
- Scope of services
- APS, AVP, PRO/DCE, ACT and construction-stage services.
Key project features
- Foul and surface water drainage studies, including on-site treatment of wastewater and sewage.
- Trench and duct design, utility network drawings and coordination.
- External lighting design.
- External surfacing design, connections to public roads and pavements around the site.
- Construction of a wastewater treatment plant.