Corporate headquarters · Villeneuve-sur-Verberie (60)
Extension and refurbishment of the Schlüter System headquarters in Villeneuve-sur-Verberie (60)
- Lead architect
- L’Architecte VHA, Vincent Hérault, managing architect
- Project start
- 25 February 2022
- Project status
- Under construction as at 18 July 2024, according to the certificate of satisfactory performance
- Civil infrastructure and utilities cost
- €1.76 million excluding VAT
- Scope of services
- Civil infrastructure and utilities design and construction supervision
Key project features
- Plans for the diversion and demolition of existing basins and structures.
- Surfacing and grading plans coordinated with the architect.
- Separate foul and surface water drainage plans with a stormwater attenuation basin and infiltration swales, hydraulic calculations and a site stormwater management report.
- Coordinated utility plans covering water, telecommunications, low-current systems (CFA), power systems (CFO), low-voltage electricity (BT) and external lighting.
- Detailed design and tender documents (PRO/DCE): technical specifications (CCTP) and cost estimates for civil infrastructure and utilities works.
- Construction supervision in four phases.