Fire and rescue · Rennes (35)
Construction of the departmental fire and rescue centre (SDIS) in Rennes (35)
Scope of services: French project phase codes
- APS: Outline design
- AVP: Preliminary design
- PRO/DCE: Detailed design and tender documentation
- ACT: Assistance with tendering and contract award
- Client
- Département d’Ille-et-Vilaine
- Design team
- LAN Architecte, Terrell Group (structural and building services engineering), AVR
- Area
- 8,510 m²
- Project dates
- Construction completed in 2021
- Construction cost
- €14 million
- Scope of services
- APS, AVP, PRO/DCE, ACT and construction-stage services.
Key project features
- Heavy-duty fire appliance access roads and drill yards.
- Car parks providing 172 spaces.
- Stormwater management using an open basin and storage beneath roads.