AVR - Civil infrastructure and utilities
EN FR
All projects

Infrastructure and public realm · Compiègne (60)

New bridge over the Oise and surrounding public realm works in Compiègne (60)

Scope of services: French project phase codes
  • APS: Outline design
  • AVP: Preliminary design
  • PRO/DCE: Detailed design and tender documentation
  • ACT: Assistance with tendering and contract award
Client
Agglomération de la Région de Compiègne (ARC)
Design team
Explorations Architecture (architect), agence Ter (landscape architect and urban designer), TERRELL SAS (engineering consultant) and AVR (civil infrastructure and utilities consultant)
Area
3 ha
Project dates
Construction: 2009 to late 2011
Construction cost
Development works (ZAC): €1.9 million
Scope of services
APS, AVP, PRO/DCE, ACT and construction-stage services.

Key project features

  • Integration of the new bridge between the Université de technologie de Compiègne and the historic centre.
  • Support for redevelopment of plots and buildings.
  • Riverbank works on the Compiègne side, including pedestrian and cycle routes.
  • Improvements to existing town-centre traffic circulation.
  • Utility diversions and refurbishment.
Oise Bridge and Surroundings - view 1
Oise Bridge and Surroundings - view 2
Oise Bridge and Surroundings - drawing 3

Open original-size image