Offices · Clichy (92)

Construction of an office building in Clichy (92)

Scope of services: French project phase codes
  • APS: Outline design
  • AVP: Preliminary design
  • PRO/DCE: Detailed design and tender documentation
  • ACT: Assistance with tendering and contract award
  • VISA: Review of contractors’ execution drawings for conformity with the design
  • DET: Supervision and administration of construction contracts
  • AOR: Assistance with acceptance, handover and defects close-out
Client
SCI CLICHY BAC, 43 avenue Marceau, Paris
Design team
COMBAREL et MARREC Architectes, TERRELL, BARBANEL, VR et GREEN, MAZET et ASSOCIÉS, AVR
Area
External areas: 4,900 m²
Project dates
Design started in 2016; construction completed in 2024
Construction cost
€75 million; civil infrastructure and utilities: €1.2 million
Scope of services
APS, AVP, PRO/DCE, ACT, VISA, DET, AOR.

Key project features

  • Liaison with utility providers and utility enquiries (DT).
  • Two separate office building plots.
  • Bulk earthworks.
  • Stormwater management using two attenuation and infiltration basins.
  • Heavy-duty and light-duty roads and external works.
  • Drainage, utility networks and external lighting.