Healthcare facility · Jossigny (77)
New Marne-la-Vallée Hospital in Jossigny (77)
Scope of services: French project phase codes
- APS: Outline design
- AVP: Preliminary design
- PRO/DCE: Detailed design and tender documentation
- ACT: Assistance with tendering and contract award
- Client
- Hôpital de Lagny
- Design team
- Brunet Saunier Architecte (architect), Terrell and Artelia (engineering consultants), Pena et Pena (landscape architect) and AVR (civil infrastructure and utilities consultant)
- Site area
- 76,000 m²
- Completion
- 2013
- Construction cost
- Civil infrastructure and utilities package: €165 million
- Scope of services
- APS, AVP, PRO/DCE, ACT and construction-stage services.
Key project features
- HQE environmental quality construction project.
- Surfacing: asphalt, exposed-aggregate concrete including kerbs, and grass reinforcement paving for fire appliance access.
- Stormwater management using a swale connected to a stormwater basin, including treatment.
- Electricity, telecommunications, geothermal, water supply and firefighting networks.
- Construction of a helipad.
- Earthworks with on-site soil treatment.
- Coordination with EPAMARNE for the construction of a new road serving the hospital and other sites.