AVR - Civil infrastructure and utilities
EN FR
All projects

Education · Gonesse (95)

Construction of a dining facility and partial refurbishment of Collège Philippe Auguste in Gonesse (95)

Scope of services: French project phase codes
  • APS: Outline design
  • AVP: Preliminary design
  • PRO/DCE: Detailed design and tender documentation
  • ACT: Assistance with tendering and contract award
  • VISA: Review of contractors’ execution drawings for conformity with the design
  • DET: Supervision and administration of construction contracts
  • AOR: Assistance with acceptance, handover and defects close-out
Client
Conseil départemental du Val-d’Oise, 2 avenue du Parc, 95000 Cergy-Pontoise
Design team
MARS architectes, Batiserf, Louis Choulet, AVR, Alternative, C2P Ingénierie, ARWYTEC
Area
External areas: 1,600 m²
Project dates
Design started in 2020; construction completed in 2024
Construction cost
Civil infrastructure and utilities: €215,000
Scope of services
APS, AVP, PRO/DCE, ACT, VISA, DET, AOR.

Key project features

  • Liaison with utility providers and utility enquiries (DT).
  • Bulk earthworks.
  • Stormwater management using two attenuation and infiltration basins.
  • Light-duty roads, external works and swales.
  • Drainage, utility networks and external lighting.
Collège Philippe Auguste in Gonesse - buildings and external works
Collège Philippe Auguste - view 2
Collège Philippe Auguste - view 3

Open original-size image